390 Central Ave

    390 Central Ave – East Rutherford, NJ

    Design Development stage of construction. Completion expected Fall of 2021.
    • Address: 390 Central Ave, East Rutherford, NJ
    • Architect: N/A
    • Civil Engineer: Stonefield Engineering
    • Mechanical Engineer: Design Build
    • Owner: Deugen Development
    • Construction Method: Construction Management with GMP
    • Cost: $7,200,000.00
    • Duration: One Year

    Loading...